A new drag and drop scaffolding system was introduced to overcome construction difficulties with the existing jumping scaffolding system. It was found by applying to a building that it is adequate with construction of high-rise buildings. The system also enables fast construction while minimizing labour cost and construction waste.
How to Cite:
Gampathi, G.A.P., 2005. Drag and Drop Scaffolding System. Engineer: Journal of the Institution of Engineers, Sri Lanka, 38(4), pp.71–73. DOI: http://doi.org/10.4038/engineer.v38i4.7230
Gampathi, G.A.P., 2005. Drag and Drop Scaffolding System. Engineer: Journal of the Institution of Engineers, Sri Lanka, 38(4), pp.71–73. DOI: http://doi.org/10.4038/engineer.v38i4.7230
Gampathi GAP. Drag and Drop Scaffolding System. Engineer: Journal of the Institution of Engineers, Sri Lanka. 2005;38(4):71–3. DOI: http://doi.org/10.4038/engineer.v38i4.7230
Gampathi, G. A. P. (2005). Drag and Drop Scaffolding System. Engineer: Journal of the Institution of Engineers, Sri Lanka, 38(4), 71–73. DOI: http://doi.org/10.4038/engineer.v38i4.7230
1. Gampathi GAP. Drag and Drop Scaffolding System. Engineer: Journal of the Institution of Engineers, Sri Lanka. 2005;38(4):71-73. DOI: http://doi.org/10.4038/engineer.v38i4.7230
Gampathi GAP, ‘Drag and Drop Scaffolding System’ (2005) 38 Engineer: Journal of the Institution of Engineers, Sri Lanka 71 DOI: http://doi.org/10.4038/engineer.v38i4.7230
Gampathi, G. A. P.. 2005. “Drag and Drop Scaffolding System”. Engineer: Journal of the Institution of Engineers, Sri Lanka 38 (4): 71–73. DOI: http://doi.org/10.4038/engineer.v38i4.7230
Gampathi, G. A. P.. “Drag and Drop Scaffolding System”. Engineer: Journal of the Institution of Engineers, Sri Lanka 38, no. 4 (2005): 71–73. DOI: http://doi.org/10.4038/engineer.v38i4.7230
Gampathi, G A P. “Drag and Drop Scaffolding System”. Engineer: Journal of the Institution of Engineers, Sri Lanka, vol. 38, no. 4, 2005, pp. 71–73. DOI: http://doi.org/10.4038/engineer.v38i4.7230